The year 2020 has extremely inventive for Rentaload with the release of 8 new products, always guided by the same vision: offering SMART solutions with the aim of ADDING-VALUE to our customers., Please find below more details :
- The 21 kW SMART load bank
- The Smart Tower
- The 6 kW DC load bank
- The Supervision software for 21 kW
- The 200 kW Low Delta T load bank
- The 650 kW load bank
- The Distribution board for 100/200/300 Low Delta T load banks
- The Supervision software for Low Delta T load banks
- THE 200 kW LOW DELTA T LOAD BANK
- “Smart solutions to reduce time and to do the commissioning more efficiently”
Dedicated to large Data Halls, the new 200 kW load banks offers a low delta T of 35K at full power preventing the room and the direct environment from any damages during the commissioning tests. This low delta T is also similar to our 21 kW load banks allowing a better heat distribution in the room (see specifications of our new 21 kW connected load banks just below). And these SMART load banks can be managed using the Rentaload supervision software to simplify and reduce the time of operation.
Main Features:
- Lowest Delta T available in the market
- Easy connection using Powerlocks
- Connected load banks to run and manage an entire fleet remotely and collect data during the commissioning tests
- Vertical airflow deflector available as an accessory
- Reduced dimensions (width:77 cm) and wheels for easy handling
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE 6 kW DC LOAD BANK
“A unique portable DC server emulator to test edge datacentres.”
Testing edge datacentres powered with DC system requires specific load banks. With the new DC 6 kW load bank, Rentaload offers again a rackable solution that perfectly fits in small edge DC sites. This new 6 kW server emulator is also designed to be managed by software, allowing commissioning teams to collect and record the data (P, U, I, t°) during the tests. The design of this load bank allows 2 power supply (lane A and B) using an integrated ATS, avoiding cables changes from one lane to the other during the tests.
Features :
- Rackable DC load banks
- 50/50% Dual Power supply (line A and B) with integrated ATS
- Resolution: 1 kW
- Connected load banks to run and managed an entire fleet remotely and to collect the data the tests
- Variable and selectable ∆ T° (between 10 to 26°C)
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE 21 kW SMART LOAD BANK
The first connected solution on small floor standing 21 kW load banks! With the possibility to connect up to 240 load banks in the same loop, commissioning teams can benefit from this smart global solution to run and manage a complete fleet and collect and record data during the tests.
The new 21 kW load bank generation offers also improved delta T, as low as 35K, to allow a better heat distribution in the data hall to reproduce the hot & cold aisles.
“The 1st connected solution on a large fleet of 21 kW load banks. “
Features :
- Run and manage remotely up to 240 load banks simultaneous.
- Managed by software. Simplify and reduce test duration
- Better ∆ T° (Low delta T: 35 K @ full power)
- Higher cut-off temperature
- Smaller resolution: 1 kW
- Floor standing units on wheels for easy handlings
- Dual Power Supply for testing 2 busbars (in mono or three-phase)
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE 650 kW LOAD BANK
The new 650 kW load banks offer an easy plug-and-play solution, equipped with Powerlocks sockets the connection is easy especially when using our standard 20-meter length cables also with Powerlock connectors.
With the possibility to connect up to 48 load banks in the same loop, several load banks can easily be used as a block to deliver several MW total power.
“A plug-and-play solution for blocks of 650 kW load banks.“
Features :
- Up to 48 load banks connected to form blocks
- Plug-and-play connection
- Floor standing units on wheels for easy handlings (with cover for outdoor use)
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE SMART TOWER
SMART TOWER equivalent to our 21 kW load banks (see specifications of our new 21 kW connected load banks above) are offering an even better delta T of 27K at full power.
Exceptionally adaptable in terms of connection, you can connect these smart towers either in mono or triphase systems, directly to the PDUs, Busbars or temporary distribution boards, with or without an ATS.
“The ultimate flexibility for connections and all possible DC room environment. “
Features :
- Up to 3 x 7 kW
- Lower resolution: 0,5 kW
- Low delta T: 27 K @21kW
- Ultimate flexibility in terms of connectors
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE TEMPORARY DISTRIBUTION BOARD FOR 100/200/300 kW LOW DELTA T LOAD BANKS
To limit the deployment of cables when testing large data halls, the temporary distribution boards are a perfect help. Thanks to this new accessory, commissioning teams can save up to 50% of cables, time and human resources.
As per our 650 kW load banks (see specifications of our new 650 kW above), these distribution boards are all equipped with Powerlock socket offering an easy plug-and-play solution and with an electrical protection adjustable up to 1000A.
A solution that can be adjusted on every single Datacentre electrical infrastructure according to the main distribution board configuration.
“A plug-and-play solution on distribution boards.“
Features :
- Plug-and-play connection
- Includes a circuit breaker (up to 1000A)
- Floor standing units on wheels for easy handlings
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
- THE SUPERVISION SOFTWARE FOR 21 KW
“A smart tool to save up to 30% on human resources on-site and to cut down commissioning time.“
Our new range of 21 kW connected load banks can be remotely managed by a computer equipped with our new supervision software. Commissioning teams can then easily send run and manage the entire fleet and collect & record data during the tests.
With an easy set-up protocol, this solution is quickly deployed on-site.
Associated with last year launched wireless sensors in partnership with EkkoSense, all information can then be « live » displayed on 3D modelization. Virtual navigation into the Data Center during the tests is also possible.
Features :
- Plug-and-play solution
- Collect & Record the data during the commissioning (Datalogger)
- Saving time & money
- Reduce the number of people on-site due to Covid19 restrictions
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com
THE SUPERVISION SOFTWARE FOR THE 100/200/300/650 kW LDT LOAD BANKS
Groups of several load bank types are easily managed with our supervision software, allowing the commissioning teams to run the entire fleet and collect&record the data.
Cycle tests/scenarios, according to the commissioning script, can be set up into the supervision software to accelerate the transition period between tests.
« a supervision software to optimize your Test & Commissioning phase »
Features :
- Plug-and-play solution
- Run & Managing
- Collect & Record Data
- Programming Cycle tests/scenarios
- Reduce the number of people on-site – Covid19
- Saving time & money
FOR MORE INFORMATION, CONTACT US at contact@rentaload.com